CCRI Project

CCRI – Flanagan Campus in Lincoln RI:

This sewage pumping station was built in 2016 to replace an existing one that was outdated.  Boydco also maintains the pumping station for the college.

CCRI – Flanagan Campus in Lincoln RI:  This sewage pumping station was built in 2016 to replace an existing one that was outdated.  Boydco also maintains the pumping station for the college.

 

Hill Street – Danvers MA:  This water booster station was built in 2020 to aid in the towns water pressure and water booster stations for near by residents. 

 

Fiske Hill  – Sturbridge MA:  This water booster station was built in 2021 to replace an existing towns water booster station. 

 

Twin River Casino – Tiverton RI:  This sewage pumping station was built in 2017 to help in the development of the new Twin River Casino.  Boydco also maintains the pumping station for the casino.

 

East Point – East Providence RI:  This sewage pumping station was built in 2024 to help in the development of the new condos and apartments that are being built. 

 

Hardwick – Hardwick, MA:  This generator building was built in 2024 to go along side with the new sewage pumping station built for the town.   

 

Lakeview Drive – Danvers MA:  This water booster pumping station was built in 2024 to replace an existing water booster station for the town.